Senior Construction Scheduling Specialist Job at Kelly Science, Engineering, Technology & Telecom, Seadrift, TX

VTdrVUhtTGZiTElvRk5nTDBXbC9ncHZrTmc9PQ==
  • Kelly Science, Engineering, Technology & Telecom
  • Seadrift, TX

Job Description

Kelly is currently seeking an experienced Senior Construction Scheduling Specialist in the Seadrift, Texas area! The Senior Construction Scheduling Specialist acts as a technical resource for Scheduling within the Global Project Methodology (GPM) work process and supports establishment of the overall construction schedule baseline and reporting to monitor and control the construction activities within established tolerances of the baseline supporting efficient project execution. In this role you coordinate data inputs from the various construction contractors and internal disciplines to ensure accurate forecasts and reporting of schedule and engage the project steering team to understand causes of the deviation and the need to establish actions to mitigate, where deviations from established tolerances occur. Requires expanded conceptual and practical knowledge in own job discipline and broadens capabilities.

Responsibilities / Duties

  • Recommendations on cycle time reduction opportunities and techniques
  • Develops and maintains comprehensive integrated master project schedules including Detail Design, Procurement, Construction and Start-up/Commissioning Project Stages.
  • Utilizes project cost estimates to resource load project schedules and gain alignment with estimated scope of work and the project schedule.
  • Recommendations on cycle time reduction opportunities and techniques
  • Performs staffing density checks or staffing limitation checks to validate schedule durations and ensures resource-level supports the project strategy.
  • Leads project teams in forecasting schedule challenges and offers analyses and solutions to complete the project on schedule.
  • Performs critical path analysis to determine problem areas in regard to project schedule and resource overloads and offers alternative courses of action to the project team.
  • Evaluates project deviations to assess schedule impact for proper decision making and recovery plans.
  • Applies established schedule management practices to ascertain critical schedule issues and recommend corrective actions. Experience
  • Practical experience as a scheduler working for a large main construction contractor in coordinating multiple subcontractors (e.g. in coordination of civil, structural steel, piping, insulation and scaffolding etc
  • Assist in developing and maintaining comprehensive integrated master project schedules including Front-end Loading, Detail Design, Procurement, Construction and Start-up/Commissioning Project Stages.
  • Maintains construction schedule during the project life cycle monitoring progress and incorporating modifications where changes in the original scope occur or delays are encountered.
  • Leads project teams in forecasting schedule challenges and offers analyses and solutions to complete the project on schedule.
  • Evaluates project deviations to assess schedule impact for proper decision making and recovery plans.
  • Applies established schedule management practices to ascertain critical schedule issues and recommend corrective actions.
  • Assist in quantity tracking and installation rates
  • Performs quantity surveys to validate construction progress

Required qualifications

  • A minimum of a bachelor's degree in any discipline or 10 years of experience in project controls, engineering, manufacturing, or related experience.
  • Prior construction related experience.
  • Proficiency within P6.

Job Tags

For subcontractor,

Similar Jobs

Elsdon Group

Construction Project Manager Job at Elsdon Group

 ...budgets, and cost controls Coordinate with superintendents, subcontractors, consultants, and vendors Lead subcontractor buyout, contract administration, and change order management Ensure compliance with safety standards, building codes, and contract documents... 

The 'Quin House

Food and Beverage Manager Job at The 'Quin House

 ...WHO ARE WE LOOKING FOR? The ideal candidate is a driven self-starter with an entrepreneurial spirit who is passionate about anything food & beverage, hospitality, people, talent development, teambuilding and people culture champion. They enjoy being part of a start-up... 

Farm Job Search

Farm Equipment Operators Job at Farm Job Search

 ...Farm Equipment Operators (6335) Location: Lovell, Wyoming JobNumber: 6335 Farm Equipment Operators needed to help harvest spring wheat, malt barley, alfalfa seed, sunflowers, and sugar beets on a family farm operation in north central Wyoming. The operation uses... 

Thomas Foods International, USA

Production Supervisor-Palletizing-1st Shift Job at Thomas Foods International, USA

 ...responsible for the supervision of the palletization room and the processing product movement in processing and the warehouse on the 2nd shift, including weekends as business needs warrant. DUTIES AND RESPONSIBILITES: Cycle count the cooler and freezer processing... 

Panda Restaurant Group

Assistant Manager Job at Panda Restaurant Group

 ...clear mission that prioritizes people over profit. About the Role This is a full-time on-site role for a Restaurant Manager at Panda Restaurant Group located in Coon Rapids, MN. The Restaurant Manager will be responsible for overseeing the daily operations...